The Ethiopian Roads Administration (ERA) is seeking expressions of interest from qualified RC-2/GC-3 and above contractors for sub-contracting work on the UNISA - Galan - Bishoftu - Biyo Road Construction Project.

Description

REQUEST FOR EXPRESSIONS OF INTEREST

For Sub-Contracting on UNISA - Galan

-Bishoftu - Biyo Road Construction Project

The Federal Democratic Republic of Ethiopia represented by the Ethiopian Roads Administration (ERA) has allocated funds for the above mentioned Project:

I. No.

Name of the Project Sections

Length (Km)

Surface Type

Project Duration (Months)*

1

Construction works of UNISA - Galan - Bishoftu - Biyo Road project (Section km 21+500-km 38+800): Lot 1: km 32+000-km 35+170

3.17

 

AC

6

2

Construction works of UNISA - Galan - Bishoftu - Biyo Road project (Section km21+500-km38+800): Lot 2: km 35+170-km 38+350

3.18

 

AC

6

The Ethiopian Roads Administration hereby invites qualified RC-2/GC-3 and above contractors to express their interest in undertaking the below-mentioned work components as subcontractors on a fixed rate basis for the above listed sections of the project.

  • Earthwork,
  • Sub base,
  • Side drainage,
  • Walkway, and
  • Landscaping works in full compliance with the highest civil engineering standards established by the Ethiopian Roads Administration.

The Contractor is responsible to ensure the works are executed to highest quality, within the budget and schedule. The envisaged subcontract works is scheduled for 6 months of construction followed by 1 year Defect Notification Period. The scope includes mobilization of all required equipment and qualified personnel to achieve the project objectives.

Interested contractors must demonstrate their capacity to perform the assignment by submitting information that confirms their qualifications. Contractors are required to provide the following minimum information:

  • Specifically indicate the sections interested to participate.
  • Eligibility documents, relevant licenses, and certifications.
  • Annual audit reports for the last five years, demonstrating construction turnover and financial soundness prepared by an independent auditor and approved by Accounting and Audit Board of Ethiopia (AABE).
  • Technical and managerial capability, including details on personnel and equipment.
  • Litigation history.
  • Disclosure of any conflict of interest.
  • List of previously executed projects with supporting evidence, description of similar assignments performed, experience under similar conditions or with accelerated (crashed) schedules, and list of appropriate key experts/staff with relevant skills and experience for the assignment
  • The Client may select high-ranking contractors through a merit-based scoring system, following a mandatory eligibility and qualification check. This framework will be used to prioritize project allocation among the highest-evaluated qualified bidders.
  • Qualification and evaluation criteria: the minimum Annual Construction Turnover, Liquid Asset/ Cash Flow, General and Specific experience for each sub-contracting works are presented follow:

Item No

Qualification criteria

Minimum Requirement for Government Financed Projects, as per the revised Procurement Directives

Project

Sub-contracting of Earthwork. Sub base, Side drainage, Walkway and Landscaping under the Construction works UNISA Galan-Bishoftu Biyo Road project (Section km21-500-km38+800): Lot: 1 km 32+000-km 35+170

Sub-contracting of Earthwork, Sub base, Side drainage, Walkway and Landscaping under the Construction works UNISA-Galan-Bishoftu-Biyo Road project (Section km21+500 km38-800) Lot 2: km 35+170-km 38-350

1

Annual Construction turnover

Local applicants: ETB 622 Million (Peak)

Foreign applicants: ETB 2.074 Billion (Average)

Local applicants: ETB 626 Million (Peak)

Foreign applicants: ETB 2.087 Billion (Average)

For a Joint Venture (JV) of Local and Foreign Firms. ETB 1.244 Billion

For a Joint Venture (JV) of Local and Foreign Firms. ETB 1.252 Billion

2

Liquid asset /cash flow requirement

Local applicants: ETB 259 Million

Foreign applicants: ETB 345 Million

Local applicants: ETB 260 Million

Foreign applicants: ETB 347 Million

3

General Construction experience

Local applicants  

For Grade 2 and above 5 years and for Grade 3, 3 years of firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or sub-contractor

Foreign applicants

8 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or sub-contractor

Local applicants  

For Grade 2 and above 5 years and for Grade 3, 3 years of firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or sub-contractor

Foreign applicants

8 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or sub-contractor

4

Specific construction project experience

Local applicants:

A Minimum of new gravel road construction or any type of asphalt (DBST, TST or AC) Road Construction or Upgrading or Rehabilitation or oveday Heavy maintenance or routine and periodic maintenance of roads project with a value of at least,

  • One (1) Project with a value of ETB 518 Million OR
  • Two (2) Projects each with a value of ETB 259 Million OR
  • Three (3) Projects cach with a value of ETB 172 Million

Within the last ten (10) years that has been successfully and substantially completed (70% Completed).

Foreign applicants:

A Minimum of two AC Road Construction or Upgrading or Rehabilitation projects with a value of ETB 518 Million within the last ten (10) years that has been successfully and substantially completed (80% Completed)

Local applicants:

A Minimum of new gravel road construction or any type of asphalt (DBST, TST or AC) Road Construction or Upgrading or Rehabilitation or averlay/ Heavy maintenance or routine and periodic maintenance of roads project with a value of at least,

  • One (1) Project with a value of ETB 521 Million OR
  • Two (2) Projects each with a value of ETB 260 Million OR
  • Three (3) Projects each with a value of ETB 173 Million

Within the last ten (10) years that has been successfully and substantially completed (70% Completed).

Foreign applicants:

A Minimum of two AC Road Construction or Upgrading or Rehabilitation projects with a value of ETB 521 Million within the last ten (10) years that has been successfully and substantially completed (80% Completed).

5

Grade

GC-3 or RE-2 and above

GC-3 or RE-2 and above

         

Note:

Performance record of firms will be assessed and considered for the shortlisting purpose. Contractors may form joint ventures to enhance their chances of qualification. Expressions of interest will be evaluated in accordance with the Public Procurement and Property Authority Proclamation of the Goverment of the Federal Democratic Republic of Ethiopia

Expressions of Interest must be delivered to the address below on or before July 10, 2026 at 5:30 PM with the format provided by ERA this specific submission. Late submissions may be rejected Interested eligible Applicants may obtain further information from the Engineering Procurement Directorate, Ethiopian Roads Administration during office hours from 8:30 to 12:30 in the morning and 13:30 to 17:30 in the afternoon from Monday to Thursday and from 8:30 to 11:30 in the morning and 13:30 to 17:30 in the afternoon on Fridays (Local time), except public holidays,

Mr. Mihiretu Elias

Engineering Procurement Directorate, Director

1" Floor, Block B,

P. O. Box 1770

Ras Abebe Aregay Street

Tel: +251 11 518 5774-Ext 2200/2204

E-mail: eraengproceoi@era.gov.et

Addis Ababa, Ethiopia

Ethiopian Roads Administration


Tender details

  • Deadline: 2026-07-10
  • Bid closing time: 17:30
  • Bid opening: 2026-07-10 17:30
  • Bid opening (note): No Specific Opening date and time
  • Region: Addis Ababa
  • Publishing entity: Ethiopian Roads Administration (ERA)
  • Buyer address: ወላይታ ሶዶ ከነዳጅ ዲፖ አለፍ ብሎ ጎፋ ማዞሪያ
  • Published: Jun 19, 2026
  • Posted at: 2026-06-19T08:48:10.000Z

Categories

Source

2merkato

Always verify against the original notice before bidding.

View original ↗
← Back to all tenders